Responsive Image Banner

Aecon posts improved results

Premium Content

05 May 2012

Canadian contractor Aecon Group posted improved results for the first quarter of 2012, compared to figures from 2011, thanks to strong performances from its Infrastructure and Industrial segments, as well as Aecon Mining.

Operating profit for the company entered into a positive, with EBITDA at CAD 400,000 (US$ 400,761) on revenues of CAD 502.2 million (US$ 503 million). This compared to a loss of CAD -14 million (US$ -14.03 million) on revenues of CAD 512 million (US$ 513 million) in Q1 2011.

Operating loss for the period also improved to CAD -16.1 million (US$ -16.13 million), compared to CAD -28.7 million (US$ -28.75 million) in 2011.

Aecon also reported a record Q1 backlog of CAD 2.4 billion (US$ 2.4 billion) at March 31,2012. This was due to a significant increase in Industrial. New contract awards of CAD 491 million (US$ 492 million) - an increase of CAD 128 million (US$ 128.2 million) - were booked in the quarter compared to CAD 363 million (US$ 363.7 million) in the first quarter of 2011.

The backlog does not include the expected revenues from Aecon's alliances and supplier-of-choice arrangements. Nor does it include an award to build six 10MW solar parks in Ontario for Northland Power Inc, which was signed subsequent to the quarter end.

According to Teri McKibbon, chief operating officer at Aecon, the company's Buildings team has made considerable improvement since the losses incurred in the first quarter of 2011 while its Industrial sector is picking up additional work that should yield beneficial results going forward.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
CICA president: Why better permitting, collaboration, and financing are key to solving global construction’s biggest issues
Regardless of where they are based, there are certain challenges that are common to construction companies all over the world
Building at the bottom of the world: Final season constructing an Antarctic research facility
British Antarctic Survey’s project manager David Brand on the challenges of building in Antarctica as handover of Discovery Building draws closer
Down and changing: ICm20 crane maker ranking
A decline in 2025 but perhaps smaller than might have been expected
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Discover what 138 construction professionals say about the future of earthmoving.

FREE REPORT

Essential reading for contractors planning their next phase of technology adoption.

Download for free