Responsive Image Banner

World’s first fully electric asphalt paver

Premium Content

Royal BAM Group’s Dutch civil engineering company has commissioned Wirtgen and New Electric to convert an asphalt spreading machine into the world’s first fully electrically driven asphalt spreading paver.

It is reported that, on an annual basis, the use of this machine will save more than 93,000 kilograms of CO₂ and 115,000 grams of nitrogen oxide emissions.

Together with partners Wirtgen and New Electric, BAM Infra has replaced the stage V motor with an electric drive consisting of a fixed battery of 270kWh and two smartly switched electric motors.

With a second 270KWh battery, the paver can immediately be moved to the next project after a long working day. This exchangeable battery is also suitable for use in other electric equipment.

The use of the electric asphalt paver saves about 150 litres of diesel per eight-hour working day. This equates to a reduction of more than 93,000 kilograms of CO₂ and 115,000 grams of nitrogen oxide on an annual basis.

The electric asphalt paver can be used for eight to ten hours on fully charged batteries. In addition to the emission benefits, it makes considerably less noise than current machines.

BAM has said that it aims to have the first completely emission-free asphalt set on the road by mid-2022.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Longer reads
Bentley Systems’ Nathan Marsh: why being first with AI isn’t always best
At Bentley’s Year in Infrastructure event, Nathan Marsh outlined why trust, authenticity and human oversight still matter in the AI age
From combat zones to worksites: a US Marine’s path to construction leadership
Former US Marine Kellen Concepcion on how he went from a military career to heading Semper Fi Rebar, a California subcontractor
Global construction’s carbon footprint to more than double by 2050
The global construction industry’s carbon footprint is set to more than double by 2050
CONNECT WITH THE TEAM
Andy Brown Editor, Editorial, UK - Wadhurst Tel: +44 (0) 1892 786224 E-mail: [email protected]
Neil Gerrard Senior Editor, Editorial, UK - Wadhurst Tel: +44 (0) 7355 092 771 E-mail: [email protected]
Eleanor Shefford Brand Manager Tel: +44 (0) 1892 786 236 E-mail: [email protected]
Peter Collinson International Sales Manager Tel: +44 (0) 1892 786220 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Why telematics could be the most important item in your toolkit

NEW ARTICLE

Think telematics is just another feature that comes with the machine? Think again. Rokbak’s Graeme Blake explains how the right data can boost uptime, cut fuel costs and transform project performance.

Read now